Bluelab Dosetronic Solenoid Kit Instrukcja Użytkownika Strona 33

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 45
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 32
29
Version S1.3 : 260511
Bluelab Dosetronic Solenoid Kit
Bluelab Corporation Limited
Preparing System to Run
Setting up the Dosetronic system involves setting the Control direction, Required values and On and Off times. These settings
can be edited by scrolling through the Mode menu on the Dosetronic Control panel. The steps for this are outlined in chapter 3.
4.1 Prepare the Dosetronic system to run
Step 1. Flush out PVC shavings and glue residue
If your system has been installed it is important to ush out PVC shavings
(swarf) and any glue residue before growing commences. To do this ll your
nutrient tank and then ush all water from your system.
Step 2. Fill tanks A, B and pH with stock solutions.
Step 3. Manually prime tank
In order for the Dosetronic to adjust your main nutrient tank to your
programmed required values you need to manually prime the tank with nutrient.
By Raising the EC to above 0.1 the Dosetronic will be able to start dosing.
Dosing stops at 0.0 - 0.1EC to prevent dosing if the probe is out of solution.
(Instructions are on the following page)
Step 4. Check readings/settings
Make sure all your settings are working and that your readings are within your
required range by scrolling through the mode menu.
Step 5. Plug Solenoids into mains power.
Outlined on page 10
Step 6. Plug heater/cooler into mains power.
Outlined on page 12
Step 7. Complete checklist opposite.
Step 8. Select Control in mode menu. System should be running.
Monitor system regularly for 24 hours to check On & Off times are correct and
control is stable.
4
Note: The pH probe must be
kept wet at all times. Ensure the
nutrient probe is clean and the pH
probe calibrated before starting
this task.
Nutrient tank set-up
Stock solution
Dosing system
Control case
Probe connections
Heater/Cooler
Alarm Box (optional)
Main Power
Units
Control direction
Off Times
On Times
pH calibration
Check dosing
Final Checklist
Przeglądanie stron 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 44 45

Komentarze do niniejszej Instrukcji

Brak uwag